I am using the openMAINT web interface, and I have set the following data needed for the PM process:
- Maintenance manual
- Prev. maint. configuration
- Prev. maint. calendar
In the Administration Module > Task manager > Process, I am trying to add a task that would, for instance, create a Prev. Maint. work order every month for an equipment inspection.
How would I go about doing that? What process attributes are needed to automate this task creation?
1 Like
Following up to this issue, I have checked in the Preventive Workorder process that there is the option: Prev. maint. calendar entry.
In the Administration Module, there is the option to put in the Prev. maint. calendar entry as a process attribute. However, instead of the selecting a manual entry, there is the option for Value. Where can I find the value that correlates to the calendar entry?
The next page has the cron values, which I’ve entered as well: 0 12 * * *